Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork

Product Details
Customization: Available
After-sales Service: Online Technical Support
Certification: ISO, ROHS, CE
Still deciding? Get samples of US$ 1/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
R&D Capabilities
The supplier has 5 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (15)
  • Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
  • Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
  • Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
  • Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
  • Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
  • Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
ZMADTO-SFF-A8
Material
Steel
Type
Column Formwork
Capacity
90kN/Sq.M
Reuse
7years
Application
Civil or Commercial Buildings,
Standard Size
3000*1200;3000*950;3000*600
Standard Size2
1200*1200;1200*950;1200*600
Standard Size3
600*1200;600*950;600*600
Specification
3000*1200; 3000*950; 300*600; 1200*1200
Trademark
ADTO
Origin
China
Production Capacity
50000sqm/Year

Product Description

Product Description

Item No,:

ZMADTO-SFF-A8 High load capacity to 90KN/sq.M
Long reusable life to 7 years (Face panel 30 times reusable)
Easy erection and dismantle. 80% labor saved and more fast working
Minimum disposal materials and waste

Pictures:
Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
                                            Easy erection B-Form Adjustable Column & Shear wall Modular Vertical Formwork Shuttering system
 
Features:


More Quickly:
- Quickly erection and dismantlement: 20 minites complete a column formwork including all fastening work. 
- Modular design: suitable for any different shap and dimension vertical concrete body. 
- Don't need re-assembly when change the working place. 
- With Wheels: easy to move formwork only by manpower is enough.
- All operation by hammer is enough.
 

More Safety:
- High strength ability panel: 90KN/m2 load capacity
- Free disposal materials lead to clean worksite. More clean more safe.
- Complying with European safety standards.
 
More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Easy to train and no skilled labour required
- Standardized panel and multipurpose accessories 
 
SIMPLE IS BEST, Only 9 regular size formwork panel:
3000x1200; 3000x950; 3000x600;

1200x1200; 1200x950; 1200x600;
600x1200; 600x950; 600x600; (As following drawing)


Highly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall FormworkHighly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall FormworkHighly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall FormworkHighly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall FormworkHighly Efficient Metal Steel Framed Concrete Formwork System, Adjustable Steel Frame Column/Wall Formwork
FAQ:
1. Q:Do you have factory ?
A:Yes, we also have own plywood factories to supply various plywoods and ensure fast delivery. 

2. Q:What is your MOQ?
A:Normal MOQ is 1x20GP
 
 3. Q:Could we get free samples?
A:Yes. Samples is freely prepared, but pls make freight collected by your side. 
And This charge'll be deducted from total value once you order from us.
 
4. Q: How can you promise the quality? 
A: To supply the high quality board to every customer. ZMADTO workers are serious in every process, every details,
from sourcing the timber/veneer to check panels piece by piece. Just to satisfy every customer, and make long term cooperation. 

5, Q: What is your delivery time?
A: 15-25 working days after received advance payment or LC.

6, Q: What is the delivery port?
A: Qingdao, Tianjin.

7.Q:May I visit your factory for inspection before placing the order?
A: You are warmly welcome to visit our factory anytime. Please let us know your schedule in advance.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier